Oil & gasSD-WAN
46-site SD-WAN refresh across three governorates
Problem. A patchwork of leased lines, consumer routers and unmanaged switches across field offices, camps and a head office. No central visibility, no failover, and an average of six site-down incidents a month.
Solution. Standardised branch appliance with dual-carrier uplinks, VSAT fallback on the eleven most remote sites, application-aware routing and central policy. Every site pre-built and burn-in tested in our Erbil lab, then shipped ready to power on.
46Sites migrated
-38%WAN spend
4 moRollout duration
FMCGIncident response
Ransomware containment, recovery and SOC onboarding
Problem. A manufacturer called us at 05:00 with encrypted file servers, an encrypted ERP database and a backup server that had been encrypted alongside everything else. Production was stopped.
Solution. Isolated the environment, identified the entry point (an exposed RDP host), recovered from an offline copy that had escaped encryption, and rebuilt onto a segmented design with immutable backups and EDR before reconnecting anything.
31 hTo full production
0Ransom paid
24/7SOC since
EducationMicrosoft 365
3,200-user Microsoft 365 migration for a private university
Problem. An ageing on-premises Exchange server, home drives on a failing file server, no MFA anywhere, and a hard deadline: everything had to be live before semester registration opened.
Solution. Hybrid coexistence, staged mailbox moves over two weekends, home drives redirected to OneDrive, Intune enrolment for staff laptops, conditional access and MFA rolled out with a communications campaign in three languages.
3,200Mailboxes
46 TBData moved
-22%Licence cost
HealthcareInfrastructure
Hospital network and PACS storage rebuild
Problem. Imaging studies took several minutes to open on ward workstations, clinical Wi-Fi dropped in two wings, and the PACS archive was three months from full with no expansion path.
Solution. Re-cabled two wings, replaced the access layer with PoE+ switching, redesigned Wi-Fi from a physical survey rather than a floor plan, and moved PACS onto tiered storage with a nearline archive. All work scheduled around theatre and imaging lists.
< 4 sStudy open time
340 TBArchive capacity
0Clinical downtime
HospitalityGuest experience
Full ICT fit-out for a 260-room hotel
Problem. A new-build property needing everything from structured cabling to guest Wi-Fi, IPTV, door locks, CCTV and back-office IT, with a fixed opening date and an MEP programme that was already running late.
Solution. Coordinated ICT design with the MEP contractor, in-room and public-area Wi-Fi with PMS integration for room billing, IPTV, 180 cameras, access control and a resilient back-office core, commissioned floor by floor as construction released areas.
260Rooms live
On timeFor opening date
210Access points
Group holdingManaged services
Outsourced IT across eleven group companies
Problem. A holding group where each subsidiary ran its own IT: different vendors, different standards, no consolidated licensing, and no visibility at group level of what was even deployed.
Solution. Discovery and asset inventory across all eleven entities, a standard build and vendor set, consolidated licensing under one agreement, central monitoring, and a shared service desk with per-entity reporting to the group CTO.
11Entities onboarded
4,100Endpoints managed
-29%Combined IT spend